CUMBERLAND — Renovation work on the Interstate 68 bridge that spans Cumberland will intensify during the next two weeks as crews continue to construct elevated platforms and begin to sandblast, according to Stephen Bucy of the State Highway Administration.
Bucy said the work on bridge Section 3 near Canal Place will be followed by similar work on sections 2 and 1, toward the westerly terminus of the span.
Bucy’s comments were made Thursday evening at a public airing in the Allegany Museum.
“SHA will work with individuals to lessen the impacts (to businesses and residences) as much as possible,” Bucy said.
Entities directly impacted by work in Section 3 include the Western Maryland Scenic Railroad and Canal Place, including a picnic area as well as Canal Place shops and Atlantic Broadband.
In Section 2, renovation could impact the George Washington House Park and the sidewalk for the Fort Cumberland Trail.
When work moves to Section 1, more businesses will be impacted, including Parkview Discount Liquor, Country Accents, Sheer Beauty Styling Salon, PharmaCare/satellite post office and Cumberland Optical. Bridge Street leading to the Cumberland/Ridgeley bridge and Johnson Street are likely to have have travel delays, according to SHA spokeswoman Heather Keels.
The work schedule for the remaining four sections to the east is being revised, Bucy said. The renovation of the 44-year-old bridge is a two-year project.
It was pointed out Thursday that the new lighting to be installed will be about half of that currently in place, but will be located more strategically.
Downtown Manager Ed Mullaney was assured by SHA that lighting beneath the bridge and above parking lots will continue to be in place.
Bucy said that only two sections of below-bridge parking will be closed at any one time and those sections will not be adjacent.
When painting takes place above a street, traffic will be reduced to one lane.
Also during the next two weeks, air and soil monitoring will begin, as will concrete work on the state Route 51 bridge that carries Industrial Boulevard over the CSX railroad tracks.
Contact Michael A. Sawyers at msawyers@times-news.com.
Latest news
Work on Crosstown Bridge set to intensify
Over the next two weeks, crews to construct platforms, begin sandblasting
- Latest news
-
-
Final testing for Rocky Gap Casino
As required by the Maryland Lottery and Gaming Control Agency, the Rocky Gap Casino went through final live testing of its operations Monday, with officials hoping to open casino doors for business on Wednesday.
-
Piedmont town foreman enters guilty plea
Piedmont Town Foreman John Shingler is facing a prison term of 10 years and a fine of up to $250,000 after pleading guilty to a charge of conversion of government property Thursday in U.S. District Court, Northern District of West Virginia, Martinsburg, according to court documents.
-
New septic system rules will tax county health department
New state laws on septic systems will require increased on-site work for Allegany County Health Department staff and could lead to an eventual increase in septic system inspection fees, department officials said last week.
-
Mineral County commissioners keep ambulance authority bylaws
The Mineral County Commission voted down a proposed change to the county ambulance authority bylaws that would have allowed the ambulances to expand nonemergency transports.
-
Family has long connection to local YMCA Matriarch hopes to keep tradition in family
Vickie Murray Aman has been working at the Riverside YMCA for the past 44 years. She is the matriarch of a family who has had a longstanding relationship with the local Y.
-
County plans to regulate piercings and change rules for tattoo parlors
While Allegany County regulates tattoos, it does not currently regulate body piercings, but the county health department is planning to change that situation soon.
Legitimate tattoo and piercing shops are cooperating in the update, county health officials have said. -
Residents adopt American chestnut trees
Cradling her small American chestnut tree as if it were a newborn baby, Nancy Bean was ready Saturday afternoon to return to her Backbone Mountain home where she would grab a shovel and plant a part of the country’s heritage.
-
I-68 downtown ramp to reopen Monday
The exit 43C ramp from eastbound Interstate 68 to downtown Cumberland will remain closed through Monday morning to allow crews to repair the concrete driving surface.
-
Mineral deputy, K-9 partner named top team in W.Va.
Mineral County Sheriff’s Deputy Robert Smith and K-9 Kira were awarded West Virginia K-9 Team of the Year by the West Virginia Police Canine Association earlier this month.
-
Organizers hope canoe championships put Garrett County on map
Deep Creek 2014: International Canoe Federation Canoe Slalom World Championships is the largest inbound sporting event scheduled in the United States in 2014, according to Todd Copley, executive director of Deep Creek 2014.
- More Latest news Headlines
-
Final testing for Rocky Gap Casino



